Shutter Timing Test Rig (DOE & Automation)
At a glance
Role: Test developer—rig design; Arduino-based logging; MATLAB analysis
Scope: Bench validation testing; Design of Experiments (DOE); traceable results with pass/fail criteria
Outcome: Timing met spec across the thermal range; duty settings recommended
Three proof points
Rig: Instrumented shutter with optical sensor and reference clock in a light-shielded fixture
DOE: Temperature × duty cycle × pulse width; randomized runs with replicates
Data: Automated logs → plots and statistics (latency, jitter, pass/fail)